Projects

Energy Chain Projects

Ten real projects in the energy chain sector, from a first site assessment to a working installation. Involvement in a project means participating in the project and sharing in its actual net revenue — the Participant Pool is 10% of each project’s net revenue, distributed monthly among qualifying participants. It is not a yield on ENC and no return is promised.

Each project has a participation gate: hold ENC worth 1% of the project’s value (in CAD). The gate is a balance check only — nothing is spent, transferred, or locked, ever. Holds stack: your balance must cover the sum of the gates of every project you join. Involvement stays active only while your wallet is connected and the hold is met; if the balance drops or the wallet disconnects, involvement suspends and resumes automatically when the hold is restored.

Need ENC? Buy ENC on XMarkets · Mine ENC on Omnichain

Wallet not connected. Project details and gate figures are public; connect a wallet to see your own gate state and join.
The gate gradient: $300 → $450 → $1,200 → $2,000 → $5,000 → $8,500 → $25,000 → $120,000 → $1,200,000 → $7,500,000 of ENC (CAD value of the hold, 1% of each project’s value)

Rooftop Solar Cleaning & Inspection Crew — Edmonton Metro T1 Bootstrap

A two-person Edmonton crew for scheduled cleaning, visual inspection, and production-check visits on rooftop solar — homes, churches, and small commercial buildings — on monthly service plans, every visit and panel record kept in the ERP.

Project value$30,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneKit purchased, insurance bound, first 10 contracts signed
Participation gateHold ≈ — ENC ($300 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: Recurring service contracts ($49–$89/visit residential, quoted commercial), plus per-visit inspection reports uploaded to the Energy Chain ERP — every report is an ERP record, so the project's service history is its ledger. Revenue = service fees.

What involvement gets you: Participant Pool share (10% of net), the project dashboard (routes completed, contracts active, revenue), and priority participation when the crew expands to a second-crew project in this ERP.

Milestones: Kit purchased, insurance bound, first 10 contracts signed · 50 active service plans · second crew hired · winter snow-clearing package launched

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Second-Life EV Battery Testing Bench T1 Bootstrap

A testing bench that grades second-life EV battery packs for stationary storage duty — capacity, safety, and cycle testing with a recorded grade per pack in the ERP, so used packs get a documented second working life.

Project value$45,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneBench commissioned, safety certification passed
Participation gateHold ≈ — ENC ($450 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: Per-pack testing and grading fees ($150–$400 depending on pack size), plus a margin on brokered sales of certified packs to storage installers. Every certificate is a hash-anchored ERP record, so a graded pack carries a verifiable history.

What involvement gets you: Participant Pool share (10% of net), dashboard access to bench throughput and grading results, and first offer on certified-pack sales lots.

Milestones: Bench commissioned, safety certification passed · first 25 packs graded · installer brokerage agreements with 3 storage installers · 150 packs graded, second bench ordered

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Solar-Site Vegetation Management — Grazing & Mechanical T2 Startup

Vegetation management for ground-mount solar sites — grazing and mechanical cutting under and around the arrays, keeping production clear without herbicide programs, every site visit and contract recorded in the ERP.

Project value$120,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneFlock and equipment acquired, first site contract signed
Participation gateHold ≈ — ENC ($1,200 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: Per-acre seasonal vegetation contracts with solar operators; secondary revenue from lamb sales. Costs and contracts tracked in the ERP; site service photos and reports are ERP records per visit.

What involvement gets you: Participant Pool share (10% of net), seasonal operations reports through the dashboard, and site-visit days each grazing season.

Milestones: Flock and equipment acquired, first site contract signed · 500 acres under contract · second operator signed, lamb program running · 1,500 acres under contract across 3 sites

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Alberta Home Energy Audit Network T2 Startup

A network of certified home energy auditors across Alberta — booked audits, recorded findings, and upgrade recommendations per home in the ERP, giving households a documented starting point for efficiency work.

Project value$200,000 CAD
Participant Pool10% of net revenue, monthly
Next milestone5 auditors certified and onboarded, booking platform live
Participation gateHold ≈ — ENC ($2,000 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: Per-audit fees ($350–$550), plus referral fees from retrofit contractors (insulation, heat pumps, windows) booked off audit roadmaps. The ERP record is the product's spine — a home's energy history becomes verifiable at resale.

What involvement gets you: Participant Pool share (10% of net), dashboard reporting (audits completed by region, conversion to retrofits), and priority booking for holders' own homes.

Milestones: 5 auditors certified and onboarded, booking platform live · 300 audits completed · contractor referral program paying out · 1,000 audits, expansion to Saskatchewan metros scoped

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Community Solar Garden — 250 kW, Parkland County T3 Growth

A 250 kW community solar garden in Parkland County — subscriber plots, recorded generation, and maintenance run as one operating project in the ERP.

Project value$500,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneLand lease and interconnection study complete
Participation gateHold ≈ — ENC ($5,000 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: subscriber payments for output shares plus merchant power sales of unsubscribed generation. Output is metered and published to the ERP monthly, so every subscriber and participant sees the same production record.

What involvement gets you: Participant Pool share (10% of net), production dashboard (live output vs forecast), and a guaranteed subscription slot for holders' households at the standard subscriber rate.

Milestones: Land lease and interconnection study complete · construction, first power · 80% subscribed · fully subscribed, second garden site selected

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Waste-Heat Greenhouse Partnership — Compressor Station Heat Recovery T3 Growth

A greenhouse partnership recovering waste heat from a compressor station — heat supply, growing operations, and produce contracts run and recorded in the ERP.

Project value$850,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneHeat-supply agreement signed with the station operator
Participation gateHold ≈ — ENC ($8,500 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: wholesale produce contracts (regional grocers, food service) priced against heated-greenhouse competitors who pay full freight for gas. Heat supply agreement, yields, and sales all recorded in the ERP.

What involvement gets you: Participant Pool share (10% of net), quarterly operations and crop reports, and a standing produce-box offer for holders at contract pricing.

Milestones: Heat-supply agreement signed with the station operator · exchangers installed, greenhouse erected · first crop planted · first full winter season at contract volume

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Small Hydro Refurbishment — 1.5 MW, Existing Weir Site T4 Established

Refurbishment of a 1.5 MW small hydro unit at an existing weir — engineering, works, and commissioning managed as one project with its full record in the ERP.

Project value$2,500,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneSite rights and water licence confirmed
Participation gateHold ≈ — ENC ($25,000 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: contracted power sales (long-term PPA with a credit-worthy buyer) plus environmental attributes. Generation and PPA settlements are recorded in the ERP monthly.

What involvement gets you: Participant Pool share (10% of net), generation and settlement dashboard, and an annual site tour with the operating engineers.

Milestones: Site rights and water licence confirmed · PPA executed · turbine replacement and recommissioning · first full year at rated output

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Wind Farm Repowering — Southern Alberta T5 Large

Repowering a southern Alberta wind farm — turbine replacement and balance-of-plant works delivered as a staged construction program, recorded stage by stage in the ERP.

Project value$12,000,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneSite and interconnection secured, PPA negotiated
Participation gateHold ≈ — ENC ($120,000 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: power sales under a new PPA, environmental attributes, and resale of serviceable decommissioned components. The existing interconnection — the scarcest asset in Alberta wind — is reused.

What involvement gets you: Participant Pool share (10% of net), construction and generation reporting through the dashboard, and priority participation when the next repowering site opens in this ERP.

Milestones: Site and interconnection secured, PPA negotiated · decommissioning complete, components sold · new turbines erected and commissioned · first year at full rated output

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Green Hydrogen Production Plant — Industrial Alberta T6 Mega

A green hydrogen production plant for industrial Alberta — build and commissioning run as a major capital project with its operating record in the ERP.

Project value$120,000,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneOfftake LOIs converted to contracts, site secured
Participation gateHold ≈ — ENC ($1,200,000 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: hydrogen offtake contracts (structured as take-or-pay contracts), byproduct oxygen sales, and clean-fuel credits. Phased build: a 20 MW first phase proves operations before full expansion.

What involvement gets you: Participant Pool share (10% of net), full operational reporting (production, offtake performance, credit revenue), and phase-gate briefings before each expansion phase.

Milestones: Offtake LOIs converted to contracts, site secured · Phase 1 (20 MW) construction · Phase 1 producing, first deliveries · full-capacity expansion decision with operating data in hand

Status: Slate — awaiting owner launch approval. Joining opens at launch.

Northern Energy Corridor — Hydro & Transmission to Northern Communities T7 Giga

A hydro and transmission corridor to northern communities — a decade-scale infrastructure program phased community by community, each phase's record held in the ERP.

Project value$750,000,000 CAD
Participant Pool10% of net revenue, monthly
Next milestoneCorridor study and community agreements framework signed
Participation gateHold ≈ — ENC ($7,500,000 CAD) — 1% of project value
Your stateWallet not connected

What it does & revenue model: long-term power supply agreements with communities and regional grids, federal/provincial northern-infrastructure program contributions, and avoided-diesel cost-sharing agreements. Each corridor segment is financed and reported as its own stage inside the one project record.

What involvement gets you: Participant Pool share (10% of net) across corridor stages, stage-gate reporting in full operational detail, and a permanent seat — by hold — in the corridor's participant registry as segments come online over decades.

Milestones: Corridor study and community agreements framework signed · Segment 1 (first hydro site + transmission) financed and under construction · Segment 1 delivering power, first diesel plant retired · Segment 2 financed on Segment 1's operating record

Status: Slate — awaiting owner launch approval. Joining opens at launch.